The template
Electrical quote: consumer unit
ELECTRICAL QUOTE [Your business name] [Registration scheme and number, if you have one] [Address] [Phone] [Email] Quote number: [number] Date: [date] Price stands until: [date] For: [Customer name] Address of the work: [address] THE JOB Replace the existing consumer unit (fuse board) with a new one, as below. OPTION A: DUAL RCD CONSUMER UNIT Dual RCD consumer unit with MCBs, supplied: £[0.00] Surge protection device, supplied: £[0.00] Meter tails and main earthing conductor, where needed: £[0.00] Labour, including isolation and changeover, [days]: £[0.00] Testing, inspection and installation certificate: £[0.00] Removal and disposal of the old unit: £[0.00] Option A total: £[0.00] Deposit for option A: £[0.00], due [when] OPTION B: FULL RCBO CONSUMER UNIT Everything in option A: £[0.00] Upgrade to RCBOs on every circuit (extra): £[0.00] Extra labour, [hours]: £[0.00] Option B total: £[0.00] Deposit for option B: £[0.00], due [when] [VAT, only if you are VAT registered] NOT INCLUDED - Faults found on existing circuits during testing: you will be told what was found, and any repair priced and agreed with you before it is done - Making good plaster or decoration around the board - Work on the supplier's equipment (the cut-out and meter) - Moving the board to a new position ASSUMPTIONS - The power can be off for most of the working day - Clear access to the board, and to sockets and lights for testing DEPOSIT TERMS [Your own deposit terms, in your own words.] START AND LENGTH Earliest start: [date]. The work should take about [time]. TO ACCEPT Choose option A or B and [how to accept]. Balance due: [when]. Payment by: [methods].
A worked example
Made-up prices for a straightforward board change in a house, to show how the options read. Use your own prices.
| Item | Price |
|---|---|
| Dual RCD consumer unit with MCBs, supplied | £165.00 |
| Surge protection device, supplied | £65.00 |
| Meter tails and main earthing conductor | £40.00 |
| Labour: one day, including isolation and changeover | £300.00 |
| Testing, inspection and installation certificate | £120.00 |
| Removal and disposal of the old unit | £20.00 |
| Option A total | £710.00 |
| Deposit on acceptance, for the equipment | £230.00 |
| Item | Price |
|---|---|
| Everything in option A | £710.00 |
| Upgrade to RCBOs on every circuit (extra) | £180.00 |
| Extra labour: two hours | £60.00 |
| Option B total | £950.00 |
| Deposit on acceptance, for the equipment | £410.00 |
Why testing gets its own line
Testing and the certificate take real time, and customers rarely know that. As its own line, the customer sees what they are paying for, and you can show the same line on a quote for a rewire or new circuits.
The exclusions that matter
- Faults found on test. The most common cause of a row on a board change. Say on the quote that faults will be explained and priced before anything is done.
- Making good. A new board may not cover the old one's footprint. Say who deals with the plaster and paint.
- The supplier's equipment. If the cut-out or meter needs work, say it is outside your price and who arranges it.
- Power off. Tell the customer the power will be off for most of the day, so they can plan around freezers, alarms and working from home.
The deposit terms line is left blank on purpose. The deposit guide explains what deposits are for and links to the official rules.
Where Good Local Trades fits
Quote the board with options they pick on their phone.
- Option A and option B side by side, each with its own total and deposit
- Photos of the board with the enquiry, before you visit
- A deposit paid by card when they accept, for the equipment
- The accepted option becomes a numbered invoice, with the deposit taken off
One plan, £39 a month after a 7-day free trial. No contract. No card needed to start. Paying for your Good Local Trades plan opens soon, and nothing is charged before then. After the 7 days your account stays open until paying starts. We email you first, then you choose a plan to carry on.