How to write a quote for a job.

A good quote says who you are, who it is for, exactly what work is included and what is not, the price line by line with a total, any deposit, when you can start, and how long the price stands. Most quote disputes come from the scope, not the price, so spend your time on what is in and what is out.

Last updated . Free to use, with no sign-up.

What goes on a quote, in order

  1. Your details: business name, your name if you trade under it, address, phone and email.
  2. The customer's details and the address where the work is, if different.
  3. A quote number and the date. It saves confusion when you revise it.
  4. The job in a sentence: “Replace six fence panels and two posts on the rear boundary.”
  5. What is included, item by item, and what is not.
  6. The price, with labour and materials as lines, and a total. Show VAT if you are registered.
  7. Any deposit: how much, what it is for and when it is due.
  8. When you can start and roughly how long the work takes.
  9. How long the quote stands, as a date.
  10. How to accept, and your payment terms for the balance.

A worked example

A made-up job to show the shape. Your prices will differ; the layout is the point.

Quote 0142: replace fence panels, rear garden, 14 Sample Road
ItemPrice
Remove six old panels and two broken posts, and take the waste away£60.00
Six 6ft by 6ft lap fence panels, supplied (6 at £38.00)£228.00
Two concrete posts and two gravel boards, supplied£96.00
Post mix, clips and fixings£24.00
Labour: one and a half days£315.00
Total£723.00
Deposit on acceptance, to buy materials£250.00

Underneath, the quote would say: “Included: removing the old fence, setting new posts in post mix, fitting panels and gravel boards, taking all waste away. Not included: treating or painting the fence, moving plants or sheds along the boundary, any work on the neighbour's side. Price stands until 27 December 2026. Balance due on completion.”

Get the scope right

Scope is where most arguments start. “Supply and fit a new basin” leaves open who removes the old one, who makes good the wall, and whether the tiles behind it are touched. Write down the things a customer might assume:

  • Who removes and disposes of the old items and the waste
  • Making good: filling, plastering, decorating, or none of these
  • Access: parking, moving furniture, getting through a neighbour’s garden
  • Parts the customer is supplying, and who is responsible if they are wrong
  • What happens if you find something hidden, such as rot or old wiring, once work starts

Options: good, better, best

When a job can be done more than one way, offer two or three versions side by side: a repair and a replacement, a standard fitting and a better one. The customer picks a price they are comfortable with, instead of comparing you on one number against someone else. Keep it to three at most; more makes choosing harder.

How long a quote stays open

There is no fixed rule. Many trades write 30 days; some use 14 when material prices are moving. Put a date on it rather than “30 days”, so nobody has to work it out. If a customer comes back after it has lapsed, you can honour it or re-price it.

Mistakes that cause disputes

  • One total with no breakdown, so the customer cannot see what changed when you revise it
  • Calling it a quote when it is really an estimate, or the other way round
  • No date, so an old price gets held against you a year later
  • Leaving out the deposit until after the customer has said yes
  • Not saying what is excluded, so it is assumed to be included

VAT, CIS and consumer rights

These have rules of their own, and they change. We do not give advice on them; the official sources are below. If you are unsure, ask your accountant or your trade association.

Start from a template

The free quote template follows the order above, with a blank version and a filled-in one. There are also versions with real line items for plumbing and electrical work.

Where Good Local Trades fits

Write the quote once, and let it become the invoice.

  • Build the quote line by line on your phone, with the total worked out
  • Up to three options, each with its own lines, total and deposit
  • A deposit in pounds or a percentage, paid by card when they accept
  • The accepted quote becomes a numbered invoice, with no retyping

One plan, £39 a month after a 7-day free trial. No contract. No card needed to start. Paying for your Good Local Trades plan opens soon, and nothing is charged before then. After the 7 days your account stays open until paying starts. We email you first, then you choose a plan to carry on.

Good questions

Questions trades ask.

Is a quote the same as an estimate?

Not quite. A quote is generally read as a fixed price for the work described, and an estimate as a best guess that may change. Say clearly which you are giving, and if it is an estimate, say what could change it.

How long should a quote stay open?

There is no set period. Many trades use 30 days, shorter when material prices are moving. Whatever you choose, write the date on the quote.

Should I put VAT on my quote?

Only if you are VAT registered. If you are, show it clearly. The rules on registering and charging VAT are on GOV.UK.

Should I give the customer options?

Often, yes. Two or three versions of the job, such as a repair and a replacement, let the customer choose a price instead of going quiet or going elsewhere.