Step 1: what an hour has to bring in
Your hourly rate is not a wage. It has to cover your income, your van, tools, insurance and phone, your holidays and the days you cannot bill. The day rate calculator works it out from your own numbers and shows the sum. Divide the day figure by the hours you work in a day for an hourly figure.
Step 2: the hours the job will take
Think through the job from the moment you arrive to the moment you leave, then add the bits that get missed: loading and unloading, a trip to the merchant for what you did not bring, and tidying up. Many trades add a margin for the unknown on jobs they have not done in this kind of house before.
Step 3: materials at cost, plus a markup
Write down every part at what you paid, including small bits like fixings, sealant and consumables. Add a markup to cover the time spent getting them, the stock you carry, and the ones that go wrong. There is no right percentage, and we do not recommend one: work it out from your own costs, and keep it the same for similar jobs.
A worked example
A made-up job: fit a new outside tap. Labour at £40.00 an hour and a 25% markup on materials. Use your own figures.
| Item | Price |
|---|---|
| Labour: two hours at £40.00 | £80.00 |
| Tap kit, pipe and fittings, sundries: what you paid | £38.00 |
| Markup on materials: 25% of £38.00 | £9.50 |
| Total | £127.50 |
On the quote, the customer would see labour £80.00 and materials £47.50, with the markup folded into the materials line.
Markup and margin are not the same
In the example, you paid £38.00 and charged £47.50 for the materials. The markup is £9.50 on £38.00, which is 25%. The margin is £9.50 out of £47.50, which is 20%. People mix these up all the time, and it costs them: if you want to keep 25% of what you charge, a 25% markup is not enough.
- Markup: what you add, as a percentage of what you paid
- Margin: what you keep, as a percentage of what you charge
- A 25% markup is a 20% margin, and a 50% markup is about a 33% margin
The costs trades forget
- Travel and parking, and the time spent getting there
- The time spent looking at the job and writing the quote, which nobody pays for
- Skips, tips and waste disposal
- Tool wear, consumables and the blade you broke
- Insurance, phone, software and your accountant
- Callbacks and snagging, which are your time with no income
Check it before you send it
- Does the total cover the hours at your hourly rate, and the costs above?
- Is every part of the job on the quote, so you are not pricing in your head something the customer cannot see?
- Would you still take the job at this price on a wet Tuesday when you are tired?
- VAT registration(opens in a new tab)
GOV.UK. When you must register, and how.
- Expenses if you’re self-employed(opens in a new tab)
GOV.UK. Which business costs you can take off before tax.
When the price is worked out, how to write a quote shows how to lay it out so the customer can follow it.
Where Good Local Trades fits
See what each job really made you.
- Quote with your labour and materials as separate lines
- Expenses with receipt photos, so materials are on record at what you paid
- Roughly what each job made you, after materials at your cost
- A file your accountant can use
One plan, £39 a month after a 7-day free trial. No contract. No card needed to start. Paying for your Good Local Trades plan opens soon, and nothing is charged before then. After the 7 days your account stays open until paying starts. We email you first, then you choose a plan to carry on.